Please use this identifier to cite or link to this item: http://www.repository.rmutt.ac.th/xmlui/handle/123456789/28
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSomchai Hiranvarodom
dc.contributor.authorBoonyang Plank-Klang
dc.contributor.authorPromsak Apiratikul
dc.date.accessioned2011-06-28T11:09:07Z
dc.date.accessioned2020-09-24T04:56:38Z-
dc.date.available2011-06-28T11:09:07Z
dc.date.available2020-09-24T04:56:38Z-
dc.date.issued2007
dc.identifier.urihttp://www.repository.rmutt.ac.th/dspace/handle/123456789/28-
dc.descriptionFIRST OPERATING YEAR OF PHOTOVOLTAIC BUS STOPINSTALLED AT EDUCATIONAL THAI UNIVERSITYen_US
dc.description.abstractABSTRACTThis paper summarizes one year of monitoring of 560 WP photovoltaic (PV) bus stop that to be installed at the Faculty of Engineering, Rajamangala University of Technology Thanyaburi (RMUTT), Klong 6 Thanyaburi district, Pathumthani province of Thailand. The purpose of this work is to analyze the performance of the PV system. The system has been fully monitored since May 2006 and the PV system consists of 7 silicon polycrystalline modules and a controller or regulator of BP solar # GCR 3000 including an inverter of model # 1600 watts power surge. The daily system energy yield that can be produced is about 4000 watts-hour. An average total efficiency of PV bus stop system is approximately 18 percent.en_US
dc.language.isootheren_US
dc.subjectPHOTOVOLTAICen_US
dc.subjectBUS STOPen_US
dc.subjectPHOTOVOLTAIC BUS STOP INSTALLEDen_US
dc.subjectEDUCATIONALen_US
dc.titleFIRST OPERATING YEAR OF PHOTOVOLTAIC BUS STOPINSTALLED AT EDUCATIONAL THAI UNIVERSITYen_US
dc.typeArticleen_US
Appears in Collections:บทความ (Article)

Files in This Item:
File Description SizeFormat 
FIRST OPERATING YEAR.pdfFIRST OPERATING YEAR OF PHOTOVOLTAIC BUS STOPINSTALLED AT EDUCATIONAL THAI UNIVERSITY227.76 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.